PRICING

TENTATIVE CONSULTANCY CHARGES

  1. The fee preparation of General Arrangement drawings of Bridges over Canals/Drains @20,000+18%GST.
  2. The fee for preparation of General Arrangement drawings of Micro Hydel Projects over Canals @30,000+18%GST.
  3. The   fee   for   design   of   hydraulic  structures  such   as   Head Regulator/Cross Regulator/Falls/Rapids as below:

S.

No.

Discharge of

parent channel

Discharge of off taking

Channel

Design Fee (INR)

1

Up to 105 Cusec

Up to 105 Cusec

60,000 +18%GST

2

105 Cusec-350

Cusec

Up to 105 Cusec

60,000+18%GST

105 to 350 Cusec

1,50,000+18%GST

3

 

>350 Cusec

Up to 105 Cusec

2,00,000+18%GST

105-350 Cusec

2,50,000+18%GST

>350Cusec

3,50,000+18%GST

* For cross cum head regulator and cross/ head regulators combined with bridges, exact charges shall be quoted depending upon the complexity of work.

  1. The fee for design of T beam/ Deck slab concrete Bridges and Culverts:

 

S. No.

Description

Design Fees (INR)

1

Overall Waterway up to 6m

24,000+ 18%GST

2

6 to less than 8m

34,000+18% GST

3

8 to less than 12m

44,000+18% GST

4

12 to less than 15m

54,000+18% GST

5

More than 15m

Lump sum to be decided by

the designer

  1. The fee for design of Poles, Advertising Poles etc. as below:

 

S.

No.

Description

Height Up to

Design Fees

1

Poles, Advertising Poles etc.

Height upto 6m

9500+ 18% GST

2

7 to 10m

14500+18% GST

3

11 to 15m

19500+18% GST

4

16m to 20m

24500+18% GST

5

More than 20m

Lump Sum to be decided

by the designer

 

  1. Fee for Design of Buildings as below:

 

S. No.

Description

Design Fees

1

Design of Buildings up to 3 stories

4 Rs/sqft + 18% GST ( Subject to

minimum of 9,000+ 18%GST)

2

More than 3 stories and up to 6

stories

4 Rs/sqft+ 18%GST (Subject to

minimum of 9,000+18% GST)

3

More than 6 stories

Lump sum to be decided by

the designer

4

Vetting of Design Reports and

Drawings

50% of the above

mentioned design charges

Notes: A) Rs2/sft extra for the basement if any.

  1. Rs 1/sft extra for low soil BC and if piles are required.
  2. These rates are for drawing only, Rs 1/sft extra for the report if required.
  3. For pre stressed girders, 25% extra charges

F) For steel girders, 20% extra charges

* Exact charges shall be quoted depending upon the complexity of work.

 

  1. The fee for design of Pavements/Floors to be charged as below:

 

S.

No.

Description

Design Fees

1

Flexible Pavements

Min. Rs 19,000 per section+18% GST

2

Rigid Pavements/ Floors

Min Rs 24,000 per section+18% GST

* Actual rates to be decided by designer depending upon the CBR values/soil data/test reports

 

  1. The fee for design of Any Other Project Not Mentioned Here to be charged as below:

 

S.No.

Description

Design Fees

1

Any Other Project Not Mentioned here ( such as Industrial

Buildings, Mivan construction etc.)

Lump Sum to be decided by

the designer depending upon the type of work